Viking VUAR140 Troubleshooting Guide Page 45

  • Download
  • Add to my manuals
  • Print
  • Page
    / 92
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 44
COMPONENT TESTING INFORMATION
Illustration Component Teat Procedure Results
ERC Controlled Quick test mode Press and hold Bake Time pad for
Clean --- Double line break (DLB) on
5 seconds within the first 5 minutes Bake --
DLB
and Bake on
of power up. (This must be the Broil --
DLB and Broil on
first pad touched
.) Pressing each pad
Stop Time-
Panel light and beeper on
will force a response from control,
Bake Time
-
Displays checks and sensor readings
releasing the pad ends the response. Timer--
Displays dashes
Entries on control pad must be Clock - Display on full
within 32 seconds of each other or Oven Light- Oven light on
control will exit mode. Mode can Slew pads-
Sequences thru display segments
exited by pressing Off/Cancel. Cancel- Exits quick test mode
See Quick Test Mode Display
below.
Relay Board Listen for relay to actuate. If relay doe not actuate, verify power
Verify input and output power to relay board (120 VAC)
Relay Board Listen for relay to actuate. If relay does not actuate, verify power
Verify input and output power to relay board (120 VAC)
Quick Test Mode Displays:
Upper Oven Lower Oven
46
Page view 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 91 92

Comments to this Manuals

No comments